NCDOT crews work on repairing NC12. NCDOT photo

The North Carolina Department of Transportation (NCDOT) has made significant progress today (Saturday, Nov. 28) clearing sand and water from N.C. Highway 12 on Hatteras Island and rebuilding protective dunes following the coastal storm that impacted Dare County over the Thanksgiving holiday. 

NCDOT has announced that both sections of N.C. Highway 12 that are currently closed will reopen on Sunday although reopening times vary by location.

N.C. Highway 12 Reopenings   

  • Marc Basnight Bridge to Rodanthe (Pea Island) – NCDOT will reopen this section of N.C. Highway 12 at 8 a.m. on Sunday (Nov. 29). Crews have made significant progress clearing the roadway and rebuilding protective dunes in multiple locations along Pea Island, including near the Pea Island National Wildlife Refuge Visitor Center. A portion of the roadway on Pea Island will continue to operate with one lane of alternating traffic controlled by an automated traffic signal.
  • Cape Hatteras Drive in Frisco to the Hatteras Civic Center in Hatteras Village – NCDOT will reopen this section of N.C. Highway 12 at noon on Sunday. Due to pavement damage near the entrance to Hatteras Village, a portion of the roadway will initially reopen to one lane of alternating traffic controlled by a temporary traffic signal. Both lanes are expected to be restored once pavement repairs are completed later in the week. 

The reopening of N.C. Highway 12 between the Marc Basnight Bridge and Rodanthe on Sunday morning will restore vehicular access to most of Hatteras Island, including the communities of Rodanthe, Waves, Salvo, Avon, Buxton and Frisco.

Access to Hatteras Village, including the Hatteras-Ocracoke ferry terminal, will not be restored via N.C. Highway 12 until the second closure is lifted at 12:00 p.m.  

All other sections of N.C. Highway 12 in Dare County remain open and passable. 

When the roadway reopens, motorists should exercise caution, reduce their speed and be alert for standing water, sand, construction equipment and crews continuing recovery and repair operations. Motorists should also anticipate delays due to one-lane traffic patterns on Pea Island and near the entrance to Hatteras Village.

Previous articleTurkey trotters on Ocracoke undaunted despite weather issues

LEAVE A REPLY